Our Projects
Clarence Drive Subdivision
Donaldson Civil won this tender and proceeded onsite in early 2022 as a subcontractor to Fulton Hogan for the Three Waters portion of this subdivision development. A large drainage package was broken down into Five Stages, with the Stages that required the team to...
Haven Road Stormwater
This project was completed for NCC to divert Stormwater from a future development area. While not a straight forward project in its own right, this project needed to be staged in a way so that traffic flows could be maintained on the State highway for as long as...
Atawhai Drive Road Crossing
This pipeline across State Highway 6 North of Nelson was designed to carry all the runoff from a large development on the hill above, during a 1:100-year rain event. The pipe chosen was 1350mmm concrete line, with a large concrete outfall structure in the Atawhai...
Richmond South – Trunk Watermain
As part of Tasman District Council’s direct procurement process, this was a great project to be a part of as Donaldson Civil was involved from the design phase right through to completion and livening of the watermain. Several workshops took place between the design...
Champion Road – Minor Sewer Pipeline
A small project that managed to fit in well for the timing of the client and availability of suitable staff, this was completed during the dry summer months of February 2022 On a family property near Richmond, the 190m Sewer pipeline was constructed to cater for a...
Saxton Road – Commercial Site Works
The brief for this project was to transform the existing site which comprised of half grass field area and half seal carpark into the New Zealand post sorting center. Excavation and site filling comprised of 1,400m2 of topsoil carted offsite which was recycled to...