by Kate Donaldson | Sep 1, 2024 | Projects
Brook Street Retaining Walls and Catch Fence Client: Location: Engaged through direct procurement in late 2023, this urgent project was undertaken to complete critical works before the onset of winter. A significant slip was perched on a steep 30-degree slope above...
by Kate Donaldson | Jul 1, 2024 | Projects
Wakefield Watermain Renewals Client: Location: The Wakefield Watermain Renewals project was completed in four stages as part of the Tasman District Council’s 88 Valley Reticulation Watermain Renewal, managed by Downer NZ with Donaldson Civil as the lead contractor...
by Kate Donaldson | Jul 1, 2024 | Projects
Cable Bay Road Slip Repairs Client: Location: In late 2023, Donaldson Civil won the Cable Bay Road Slip Repairs project through a competitive tender. As the only way in and out of Cable Bay was via this road, closing the road from 9am – 12pm and 1pm – 3pm was deemed...
by Kate Donaldson | Jun 1, 2024 | Projects
Wakapuaka to Founders 33kV Power Cable Install Client: Location: The Wakapuaka to Founders 33kV power cable install involved laying 5800m of ducts (1x 150mm, 3x 100mm, and 1x 50mm) between the Founders and Wakapuaka Power Substations along State Highway 6. Donaldson...
by Kate Donaldson | May 1, 2024 | Projects
Werneth Ridge Retaining Walls Client: Location: In the aftermath of the 2022 flood event, a significant landslide occurred between properties at 9 and 11 Werneth Ridge, Atawhai. Donaldson Civil was engaged to remediate the damage, completing work on both properties...