Our Projects
Retaining Wall – Green Terramesh
Construction of a large Green Terramesh Wall with a lenght of 44m and an average height of 5m. This project was the result of an innovative design by a local Civil Engineering Consultant to repair a major slip to a property after the December 2011 Rainfall events....
Christchurch Sewer Replacement
Donaldson Civil were called to Christchurch in the days following the February earthquake to assist other teams performing emergency work. After several hundred fixes assisting the city to get back on its feet, the initial team came home while designers and planners...
Russel Street and Mount Pleasant Ave Watermain
A partial street upgrade, this project contained a wide variety of civil works. A Large Timber pole retaining wall with ground anchors was built to support roads both above and below the position of the new structure. The bulk of the work was made up from pipe...
Jenkins Stream Slip
This project was a result of significant rain events in December 2011 that caused high river levels to erode the river bank and created a hazard for motorists travelling on the road alongside. The project involved installing a new rock wall to not only support the...
Panorama Drive Retaining Walls
This project involved remediation of land that had slipped due to the significant rain events which battered the Nelson Region in December 2011. With steep slopes and difficult access, this job was challenging from the beginning. Arrangements were made with landowners...
Kaikoura Sewer Replacement
With a very old and depleted sewer system the main streets of Kaikoura needeed to be upgraded. Council tendered the jobs and Donaldson Civil won based upon the tender to use trenchless technology by way of pipe bursting in a new main line. The job involved bursting...