by civil | Apr 29, 2014 | Projects
33KV Power Cable Installation Client: Location: This project involved installation of 33KV cables in recently installed 50 and 100mm duct lines through some of Nelsons main through fares. Holes were opened on the ducts every 1000m and used as hauling and jointing... by civil | Jan 14, 2014 | Projects
Southshore Catchment, Christchurch Client: Location: With a great track record and long standing partnership with Downer our team was contacted to price the Southshore catchment in New Brighton as part of the SCIRT Chch rebuild. Subsequently winning the job due to... by civil | Nov 15, 2013 | Projects
York Stream Upgrade Client: Location: A large catchment in the hills near Nelson City needed to reduce the risk of flooding to residents surrounding the foot hills. Council decided to install 1950mm Stormwater pipes and form new inlet and oulets to resolve this issue.... by civil | Oct 29, 2013 | Projects
Retaining Wall – Green Terramesh Client: Location: Construction of a large Green Terramesh Wall with a lenght of 44m and an average height of 5m. This project was the result of an innovative design by a local Civil Engineering Consultant to repair a major slip... by civil | Oct 17, 2013 | Projects, Uncategorized
Christchurch Sewer Replacement Client: Location: Donaldson Civil were called to Christchurch in the days following the February earthquake to assist other teams performing emergency work. After several hundred fixes assisting the city to get back on its feet, the...