by civil | Jan 14, 2014 | Projects
Southshore Catchment, Christchurch Client: Location: With a great track record and long standing partnership with Downer our team was contacted to price the Southshore catchment in New Brighton as part of the SCIRT Chch rebuild. Subsequently winning the job due to...
by civil | Nov 15, 2013 | Projects
York Stream Upgrade Client: Location: A large catchment in the hills near Nelson City needed to reduce the risk of flooding to residents surrounding the foot hills. Council decided to install 1950mm Stormwater pipes and form new inlet and oulets to resolve this issue....
by civil | Oct 29, 2013 | Projects
Retaining Wall – Green Terramesh Client: Location: Construction of a large Green Terramesh Wall with a lenght of 44m and an average height of 5m. This project was the result of an innovative design by a local Civil Engineering Consultant to repair a major slip...
by civil | Oct 17, 2013 | Projects, Uncategorized
Christchurch Sewer Replacement Client: Location: Donaldson Civil were called to Christchurch in the days following the February earthquake to assist other teams performing emergency work. After several hundred fixes assisting the city to get back on its feet, the...
by civil | May 16, 2013 | Projects
Russel Street and Mount Pleasant Ave Watermain Client: Location: A partial street upgrade, this project contained a wide variety of civil works. A Large Timber pole retaining wall with ground anchors was built to support roads both above and below the position of the...
by civil | May 3, 2013 | Projects
Jenkins Stream Slip Client: Location: This project was a result of significant rain events in December 2011 that caused high river levels to erode the river bank and created a hazard for motorists travelling on the road alongside. The project involved installing a new...