Our Projects
Rutherford Street Upgrade
Donaldson Civil teamed up with two other contractors to deliver this project on the main road into Nelson. This was a full servicing and roading upgrade with Donaldson Civil completing part of the Stormwater and Watermain works as a subcontractor to Fulton Hogan. The...
Milton St Power Upgrade
Donaldson Civil was the civil contractor on this project working for Power Services.The brief was to install new 11kV cables between two locations in The Wood area of Nelson, the cable would use a variety of ducts, new and old.This complimented our team’s skill set,...
Clarence Drive Subdivision
Donaldson Civil won this tender and proceeded onsite in early 2022 as a subcontractor to Fulton Hogan for the Three Waters portion of this subdivision development. A large drainage package was broken down into Five Stages, with the Stages that required the team to...
Haven Road Stormwater
This project was completed for NCC to divert Stormwater from a future development area. While not a straight forward project in its own right, this project needed to be staged in a way so that traffic flows could be maintained on the State highway for as long as...
Atawhai Drive Road Crossing
This pipeline across State Highway 6 North of Nelson was designed to carry all the runoff from a large development on the hill above, during a 1:100-year rain event. The pipe chosen was 1350mmm concrete line, with a large concrete outfall structure in the Atawhai...
Richmond South – Trunk Watermain
As part of Tasman District Council’s direct procurement process, this was a great project to be a part of as Donaldson Civil was involved from the design phase right through to completion and livening of the watermain. Several workshops took place between the design...