Fountain Place Retaining Walls
This project involved constructing two retaining walls on two adjoining properties with the only access via one of the properties. A separate contract to install storm water between the two roads via the same properties was also completed. The work was a result of...
33KV Power Cable Installation
This project involved installation of 33KV cables in recently installed 50 and 100mm duct lines through some of Nelsons main through fares. Holes were opened on the ducts every 1000m and used as hauling and jointing pits, the ducts had 3m long sections removed and...
Southshore Catchment, Christchurch
With a great track record and long standing partnership with Downer our team was contacted to price the Southshore catchment in New Brighton as part of the SCIRT Chch rebuild. Subsequently winning the job due to competitive rates and outstanding health and safety...
York Stream Upgrade
A large catchment in the hills near Nelson City needed to reduce the risk of flooding to residents surrounding the foot hills. Council decided to install 1950mm Stormwater pipes and form new inlet and oulets to resolve this issue. The site was located through a...
Retaining Wall – Green Terramesh
Construction of a large Green Terramesh Wall with a lenght of 44m and an average height of 5m. This project was the result of an innovative design by a local Civil Engineering Consultant to repair a major slip to a property after the December 2011 Rainfall events....
Christchurch Sewer Replacement
Donaldson Civil were called to Christchurch in the days following the February earthquake to assist other teams performing emergency work. After several hundred fixes assisting the city to get back on its feet, the initial team came home while designers and planners...